We are still working towards our building warrant. This has taken extra time due to the unique nature of the building
structure and the site.
We are now working through some final engineering calculations with David Burke Structural Engineering Ltd.
In addition, following our 'failure' of our percolation test, we have required additional help from some drainage engineeers
and H2Ology have stepped in to help us out. The percolation test was required as we are treating all our own waste
(from sinks, toilets etc) on site. As part of the licence to do this, we need to show the land is fit for the purpose.
We feel we're only a couple of weeks away from our warrant now.